Calculate your project, scope by scope

Built for clients, engineers and architects: set the parameters of your build, select the work packages and compare a manual crew against robotic execution in real time.

Clients

Budget certainty and schedule visibility before the contract is signed.

Engineers

Productivity, crew size and tolerance benchmarks per work package.

Architects

Material waste, CO2 and finishing quality impact of each specification.

Project parameters

Work packages

Enable the scopes in your project and enter the area of each.

Manual process

$532,747

Duration
58 days
Labor
$74,520
Materials
$429,300
Material waste
$58,500
CO2 emissions
20.4 t
Peak crew
8 people

Play Construtech robotic

$441,131

Duration
22 days
Labor
$10,623
Materials
$383,519
Robotics & engineering
$43,740
Material waste
$16,110
CO2 emissions
7.7 t
Peak crew
3 people

Estimated saving

against the manual baseline

$91,61617.2%

Time saved
37 days
63.6%
Waste avoided
$42,390
CO2 avoided
12.7 t

Breakdown per work package

ScopeArea (sqm)Manual processPlay Construtech roboticDifference
Tile / stone paving
3213 days
3,000$366,654$290,304$76,350
Painting
279 days
6,000$126,630$118,150$8,480

Estimates use field benchmarks from executed projects. Final figures depend on site conditions, access, geometry and specification, and are confirmed in the technical diagnosis.

Want this validated against your real drawings?

Send us the plans and our engineering team returns a measured proposal with tolerance and schedule commitments.