Calculate your project, scope by scope
Built for clients, engineers and architects: set the parameters of your build, select the work packages and compare a manual crew against robotic execution in real time.
Clients
Budget certainty and schedule visibility before the contract is signed.
Engineers
Productivity, crew size and tolerance benchmarks per work package.
Architects
Material waste, CO2 and finishing quality impact of each specification.
Project parameters
Work packages
Enable the scopes in your project and enter the area of each.
Manual process
$532,747
- Duration
- 58 days
- Labor
- $74,520
- Materials
- $429,300
- Material waste
- $58,500
- CO2 emissions
- 20.4 t
- Peak crew
- 8 people
Play Construtech robotic
$441,131
- Duration
- 22 days
- Labor
- $10,623
- Materials
- $383,519
- Robotics & engineering
- $43,740
- Material waste
- $16,110
- CO2 emissions
- 7.7 t
- Peak crew
- 3 people
Estimated saving
against the manual baseline$91,61617.2%
Breakdown per work package
| Scope | Area (sqm) | Manual process | Play Construtech robotic | Difference |
|---|---|---|---|---|
Tile / stone paving 32 → 13 days | 3,000 | $366,654 | $290,304 | $76,350 |
Painting 27 → 9 days | 6,000 | $126,630 | $118,150 | $8,480 |
Estimates use field benchmarks from executed projects. Final figures depend on site conditions, access, geometry and specification, and are confirmed in the technical diagnosis.
Want this validated against your real drawings?
Send us the plans and our engineering team returns a measured proposal with tolerance and schedule commitments.
Request a technical diagnosis